---
product_id: 274705346
title: "DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black)"
brand: "delfino"
price: "€ 24.27"
currency: EUR
in_stock: true
reviews_count: 6
category: "Delfino"
url: https://www.desertcart.fr/products/274705346-delfino-extra-long-line-training-dog-leash-long-lead-large
store_origin: FR
region: France
---

# 10m ultra-long reach 360° swivel metal hook durable nylon build DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black)

**Brand:** delfino
**Price:** € 24.27
**Availability:** ✅ In Stock

## Summary

> 🐕‍🦺 Train smart, play harder — leash freedom redefined!

## Quick Answers

- **What is this?** DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black) by delfino
- **How much does it cost?** € 24.27 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.fr](https://www.desertcart.fr/products/274705346-delfino-extra-long-line-training-dog-leash-long-lead-large)

## Best For

- delfino enthusiasts

## Why This Product

- Trusted delfino brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Built to Last:** Premium nylon and heavy-duty metal hardware outlasts typical cotton leashes for long-term use.
- • **Tangle-Free Playtime:** 360° rotating metal hook ensures smooth movement without leash twists or tangles.
- • **Train Anywhere, Anytime:** Ideal for recall training, hiking, camping, or backyard fun—your dog’s new best training partner.
- • **Versatile for All Breeds:** Perfectly sized and strong enough for everything from Chihuahuas to German Shepherds.
- • **Expand Your Dog’s Freedom:** 10 meters of leash length lets your pup explore while you stay in control.

## Overview

The DELFINO Extra Long Line Training Dog Leash offers a robust 10-meter nylon lead with a 360° swivel metal hook, designed for durability and tangle-free control. Suitable for all dog sizes, it’s perfect for training, outdoor adventures, and giving your dog the freedom to roam safely while maintaining your command.

## Description

DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black) : desertcart.ae: Pet Supplies

Review: Lets you let your pet play in large areas - Great to let your pet play in large open areas without you having to constantly tug.
Review: A must to have - I would recommend this if you are training your puppy or if you want to give your dog more freedom but still have them under control. I have a sausage dog and she has no issue with the size of the leash.

## Features

- Dog Training Lead 10 meter, black.
- Made of strong nylon and durable metal hook, will outlast cotton leashes, easy to wear and remove.
- The 10 meters long lead is used for helping to train the re-call of your dog. It will be more convenient for you to training your lovable dog.
- Trigger hook for easy attachment to your dog's own collar, rotated by 360 degree allows your pet to play more secure. Allows you to teach your dog recalls and other obedience skills.
- Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B08RS7BPZL |
| Best Sellers Rank | #6,807 in Pet Supplies ( See Top 100 in Pet Supplies ) #20 in Standard Dog Leashes |
| Brand | DELFINO |
| Brand Name | DELFINO |
| Closure Type | Snap |
| Color | black |
| Colour | black |
| Customer Reviews | 4.7 out of 5 stars 29 Reviews |
| Dog Breed Size | Large |
| Item Dimensions L x W | 10L x 0.03W Meters |
| Manufacturer | DELFINO |
| Material | Nylon |
| Material Type | Nylon |
| Number of Items | 1 |
| Pattern | Solid |
| Pet Type | Dog |
| Product dimensions | 10L x 0.03W Meters |
| Size | One Size |
| Target Species | Dog |
| Unit Count | 1.0 Count |

## Product Details

- **Size:** One Size
- **Colour:** black
- **Brand:** DELFINO
- **Material:** Nylon
- **Product dimensions:** 10L x 0.03W Meters

## Images

![DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black) - Image 1](https://m.media-amazon.com/images/I/61Bug-1H+hL.jpg)

## Customer Reviews

### ⭐⭐⭐⭐⭐ Lets you let your pet play in large areas
*by A***H on 16 July 2024*

Great to let your pet play in large open areas without you having to constantly tug.

### ⭐⭐⭐⭐⭐ A must to have
*by J***R on 8 March 2023*

I would recommend this if you are training your puppy or if you want to give your dog more freedom but still have them under control. I have a sausage dog and she has no issue with the size of the leash.

### ⭐⭐⭐⭐ Conform
*by P***T on 1 July 2023*

Conform of description

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.fr/products/274705346-delfino-extra-long-line-training-dog-leash-long-lead-large](https://www.desertcart.fr/products/274705346-delfino-extra-long-line-training-dog-leash-long-lead-large)

---

*Product available on Desertcart France*
*Store origin: FR*
*Last updated: 2026-09-18*